Home›Use cases›Requirements drafting
Requirements drafting

A clean first-draft spec in days. Every line sourced.

The reference every later check runs against, built from your standards and past projects.

Weeksoff the first draft
DraftedURS-022 Data retained 10 yearsSource: Annex 11 §17
01Fewer gaps baked inA line missing from the spec is missing from every bid.
02Cycle timeTenders go out weeks sooner.
03LabourNo copy-paste from the last project.
04ReusePast projects become a library.
What you get

A verdict on every line. A person signs.

Reference
Standards, past projects, user needs
Compared
Produces the spec
Output
Draft URS, spec or tender pack
Buyer
Engineering, Quality
By industry

Where it pays off.

No call needed

Send one past project.

With its standards. Get a first draft in your template, every requirement sourced.

3-week pilot. A backtest on work you have already done. Success criteria agreed up front.

Three questions we’ll ask
  1. How long does your first URS or spec draft take?
  2. How much is copied from a past project?
  3. Who reviews the draft before vendors see it?