Decision support your QA and InfoSec can sign off.

Consensus OS prepares and checks. A qualified person decides and signs. Here is how it works, where it runs, how it is evaluated and what it looks like.

Consensus OS

One engine. One trust model.

Every use case is the same operation: a reference set, one or more source sets, and a traceable verdict that a person signs.

01 IngestDocuments and data sets.Specs, offers, SOPs, ledgers, drawings and scans, in any language. Each indexed to chapter and page.
02 ExtractRequirements, claims and figures.Split into atomic items with a stable ID, the source sentence and its page attached.
03 CompareN sources against one reference.Normalised to the same requirement, unit and language before anything is scored.
04 Trace & signEvery verdict linked. A person approves.Each result opens on the passage behind it. Nothing is final until someone signs.
No passage, no status.A claim without a source counts as a gap, never as met.
Models must agree.Several models check each line. If they disagree, a person decides.
Drafting is the inverse.It writes the reference set that every later comparison uses.
For QA

AI in GxP, answered before you ask.

The questions QA raises in the first meeting, and how the platform is built around them.

Is the AI the system of record?

No. Qualitum is decision support. Your QMS and document system stay the system of record. Qualitum prepares the work and hands it over for approval.

Who is accountable?

A qualified person on your side, with an attributable e-signature. Agents prepare and check. They never approve or sign.

How do we know a verdict is right?

Every verdict links to the page and sentence behind it, so a reviewer checks it in seconds. Several models must agree. Where they don’t, the line goes to a person.

What does the auditor see?

Every extraction, check, edit and signature, logged with who, when and which source revision. The audit trail is designed around Annex 11 and 21 CFR Part 11.

Do we need to validate it?

Start where the risk is lowest, such as supplier selection, and assess it under your own risk-based approach. We provide the architecture and validation evidence. Documentation

What if guidance on AI changes?

The approach doesn’t depend on it. Human review and sign-off are built into every workflow, so the process holds under today’s rules.

For InfoSec

Runs inside your perimeter. Not ours.

Your documents never leave the environment you control.

Single-tenantYour own instance, in your cloud or on-prem. No shared tenancy.
Data residencyEU, US or UAE, with air-gap capability.
Your choice of modelChoose the LLM, and swap it without changing the process.
No training rightsWe don’t train on your data and keep none of it.
Export-controlled workITAR and EAR programmes run inside your own environment.
Gap report hygieneNDA from our side. Files deleted after delivery.
Published evaluation method

Judge it on work you have already done.

A 3-week backtest on a closed evaluation with 3 or more bids and a finished human assessment. No live-decision risk. Success criteria are agreed with you before we start.

  • It finds at least the gaps your team found.
  • Every verdict links to a source passage.
  • Your reviewers confirm the agreed share of verdicts without rework.
  • Time on the evaluation drops by roughly half.
  • Extra gaps found are logged separately, as upside.
Week 1You send one closed evaluation, names redacted.
Week 2Consensus OS runs the check. Every verdict linked to its passage.
Week 3Side by side with your team’s matrix. You score it against the criteria.
Start with a free gap report
How it looks

The platform, screen by screen.

From the document workspace to the signed report. Illustrative data from a pharmaceutical equipment project.

Stage 01 - Ingest

The project workspace holds every document the equipment will ever be judged against

Drop in the URS, the vendor quotations, mechanical and functional specs, layouts, alarm lists, P&IDs and signed change orders. Qualitum reads each one, identifies what it is, and makes it addressable at chapter and page level.

Full screen
Projects›LYO4 - SKAN Isolator›Documents
ShareMB
Project
Documents18
Requirements247
Qualification
Design Qualification
Traceability Matrix
IQ / OQ / PQ
FAT / SAT
Assurance
Vendor comparison
Change control
Reports & export
Filters Read & classify Add document
DocumentRecognised asRevisionPagesIndexedUsed by
LYO4 - SKAN Isolator - URS
Uploaded 12 Jun 2026 · 41 pages
User Requirement Specv2.141247 requirementsMaster source
CH14.303.A.0239_CO002.pdfBasic Concept26.08.202524IndexedDQ · 38 refs
CH14.303.A.0239_HDS001.pdfHardware Design Specv1.052IndexedDQ · IQ · 61 refs
CH14.303.A.0239_FS001.pdfFunctional Specv1.288IndexedOQ · 94 refs
CH14.303.A.0239_LA002.pdfLayout drawingRev C6Indexed · OCRDQ · 12 refs
CH14.303.A.0239_AL001.pdfAlarm listv1.019IndexedOQ · 27 refs
MS - Mechanical Specification_51906.pdfMechanical Specv3.034Reading… 68%-
Complete_with_Docusign_Automation_CO.pdfSigned change order-4IndexedChange control
Lifecycle, not folders
Type detected, not tagged by hand
Drawings read via OCR
Project workspace - every document classified, indexed and linked to the artefacts that cite it.
Stage 02 - Extract

The URS becomes 247 individually addressable requirements - with their source still attached

Qualitum splits the specification into atomic, testable requirements, assigns a stable ID, and records exactly where each one came from: section, page, and the sentence itself. GxP relevance and criticality are proposed at the same time.

Full screen
Projects›LYO4 - SKAN Isolator›Requirements
Wrap textMB
Project
Documents18
Requirements247
Sections
3.3 General technical86
3.8 Health & safety41
3.10 ERES33
3.12 Materials28
Qualification
Design Qualification
Traceability Matrix
Filters · 2 Columns Extract requirements Export
URS IDRequirementSource sectionPageGxPCriticality
U3.3-1 v1.0
Isolator description - Operator will use gloves, which are integrated in the isolator, and tools, which are inside the isolator, to execute tasks in the aseptic core.
3.3 General Technical Requirements5NoInformational
U3.3-2 v1.0
Operating modes - the following operating modes must be foreseen: Production · VHP decontamination (aeration included) · Standby.
3.3 General Technical Requirements5YesMajor
U3.3-3 v1.0
Material transfer - pre-sterilised and not pre-sterilised parts can enter and leave the isolator without affecting the decontaminated status of the chamber.
3.3 General Technical Requirements5YesCritical
U3.3-4 v1.0
General - all cables and optical fibers shall be passed inside the isolator through gas tight bulkheads. The entire working area within the isolator must be cleanable.
3.3 General Technical Requirements6YesCritical
U3.3-5 v1.0
Air handling system - air during production and aeration: supply air always from surrounding Zone C area and exhaust in the same classified area.
3.3 General Technical Requirements7YesMajor
U3.10-22 v1.0
The system should automatically generate an audit trail for user actions that create or modify electronic records including electronic signatures.
3.10 ERES Requirements27YesCritical
U3.8-05 v1.0
All rotating or otherwise moving parts should be correspondingly protected during operation against contact by hand - designed in accordance with EN ISO 13857.
3.8 Health, Safety and Environment16NoMajor
GxP + criticality drive the test strategy
Every ID versioned from day one
Requirement register - the URS parsed into testable statements, each still pointing at its own page.
Detail - Provenance

Open any requirement and you land on the sentence that created it

The detail panel names the root document, the revision, the chapter and the page, and highlights the exact wording in the original PDF beside it. Nothing is paraphrased silently: if the platform rewrote a sentence to make it testable, both versions are shown.

Feature detail
U3.3-3 v1.0Material transfer✕
Pre-sterilised and non pre-sterilised parts shall be transferred into and out of the isolator without affecting the decontaminated status of the chamber.
Material transfer Pre sterilized and not pre sterilized parts can enter and leave the isolator without affecting the decontaminated status of the chamber.
LYO4 - SKAN Isolator - URS · v2.1
§3.3 General Technical · page 5
Yes - direct product contact
Critical
9.4 / 10· verbatim match, single source
Approve requirementEdit wordingFlag for review
LYO4 - SKAN Isolator - URS5 / 41-92%+
3.3
General Technical Requirements
3.3.1
Isolator description
Operator will use gloves, which are integrated in the isolator, and tools, which are inside the isolator, to execute tasks in the aseptic core. The isolator shall be designed for a two-operator workflow.
3.3.2
Operating modes
The following operating modes must be foreseen:
• Production
• VHP decontamination (aeration included)
• Standby
3.3.3
Material transfer
Pre sterilized and not pre sterilized parts can enter and leave the isolator without affecting the decontaminated status of the chamber. Transfer systems shall be defined in the design phase and agreed with the customer.
3.3.4
General
All cables, optical fibers shall be passed inside the isolator through gas tight bulkheads. The entire working area within the isolator must be accessible for cleaning.
Novartis Pharma Stein AGPage 5 of 41
Source stays open beside the requirement
Requirement detail - testable wording, verbatim source, document, page and confidence in one view.
Detail - Risk

Criticality decides how hard a requirement has to be tested

Each requirement is classified for GxP impact, patient risk, data integrity and detectability. Qualitum proposes the classification with its reasoning, the quality lead confirms or overrides it, and the resulting test strategy - which protocols the requirement will appear in - follows automatically.

Feature detail
U3.10-22 v1.0Audit trail for electronic records Critical
Direct
High
Low
Category 4
Requirement governs the creation and modification of electronic records under 21 CFR Part 11 §11.10(e) and EU GMP Annex 11 §9. Failure would not be detectable during routine operation and would compromise record reconstruction. Classified Critical; must be verified in OQ with a positive and a negative test case, and re-verified after any software change.
ProtocolTestAcceptance
OQ-114Create record as User A, verify audit entryUser, timestamp, old & new value logged
OQ-115Attempt to modify audit trail as administratorAction refused and logged
PQ-042Audit trail review over a full production batchNo gaps, sequence intact
Confirm classificationOverride… Override requires a written rationale and is written to the audit trail.
Risk classification - the reasoning, the decision and the tests it generates, on one record.
Stage 03 - Trace

Every requirement, checked against every design document, in one grid

The traceability matrix runs each requirement against each document in the project and returns the chapters that actually answer it - with chapter number, page and a supporting quote. Where the engine finds several plausible answers, it presents them as candidates rather than guessing.

Full screen
LYO4 - SKAN Isolator›Qualification›Traceability Matrix
Wrap textMB
Qualification
Requirements247
Traceability Matrix
Design Qualification
IQ / OQ / PQ
Vendor comparison
Review queue
Awaiting selection31
Low confidence9
No evidence found4
FiltersColumns Run traceExport
URS IDRequirementCO002 · Basic ConceptLA002 · LayoutHDS001 · Hardware Design
U3.3-1
Isolator description - operator will use integrated gloves and internal tools to execute tasks in the aseptic core.
Awaiting selection7 Key features / legend
7 Key features / legend
12 Concept P&ID
Awaiting selection3 Layout
3 Layout
Awaiting selection4 Utility supply table
U3.3-2
Operating modes - production, VHP decontamination (aeration included), standby.
7 Key features / legend
19 · 114 Production mode normal
15 · 704 Conditioning phase
16 · 708 Aeration 1 phase
9.1
No relevant chapter 6 Control philosophy
8.7
U3.3-3
Material transfer - pre-sterilised and non pre-sterilised parts enter and leave without affecting decontaminated status.
Awaiting selection11 Leak test & decontamination options
12 Concept P&ID
Awaiting selection3 Layout
3 Layout
9 Transfer systems
6.4⚠
U3.3-4
All cables and optical fibers passed through gas tight bulkheads; entire working area cleanable.
No relevant chapter 3 Layout
8.2
12 Penetrations & bulkheads
9.3
U3.3-9
Glove integrity testing must be possible without breaking the decontaminated state.
No relevant chapter No relevant chapter Gap - no evidence
Raise design question to vendor
Reviewer queue, sized and prioritised
Weak match flagged, not hidden
Gaps surfaced early
Traceability matrix - requirements down, design documents across, evidence and confidence in every cell.
Detail - Human in the loop

Where the engine is not certain, it asks - and shows its working

Each candidate carries its chapter name, chapter number, supporting quote, page and confidence. The reviewer selects, edits or adds a candidate; the decision, the reviewer and the timestamp go to the audit trail. Confidence is never used to auto-approve a critical requirement.

Feature detail
U3.3-1 v1.0CH14.303.A.0239_CO002.pdf - Basic Concept✕
Select the chapter that evidences this requirement. 4 candidates found across 24 pages.
7 · Key features / legend
Isolator application: Aseptic
page 8confidence 9.2verbatim
7 · Key features / legend
Room classification: C
page 8confidence 7.4partial
7 · Key features / legend
Decontamination system isolator: SIS700 (35% H₂O₂)
page 8confidence 6.8partial
12 · Concept P&ID
The diagram shows a self-contained unit with an 'AHU Air Handling Unit' in the 'Technical Area'.
page 14confidence 5.1read from drawing
Confirm selection + Add candidate Mark as not applicable Reviewer: M. Baškovč · 22 Jul 2026
Chapter, page and quote - always
Drawings read too
Candidate review - the platform proposes, a qualified reviewer disposes, the audit trail records both.
Stage 03 - Trace

Vendor offers compared requirement by requirement, not chapter by chapter

Load two or more supplier quotations and Qualitum answers the only question that matters: for each of your 247 requirements, does this offer meet it - fully, partially, or not at all? Every verdict carries the supplier's own wording and the page it appears on.

Full screen
LYO4 - SKAN Isolator›Assurance›Vendor comparison
Wrap textMB
Filters · Critical onlyColumns Run comparisonAdd offerExport
Requirements compared
247
across 2 offers
Vendor 1 - weighted fit
81%
144 met · 79 partial · 24 not addressed
Vendor 2 - weighted fit
54%
62 met · 48 partial · 137 not addressed
Clarifications to raise
31
18 critical · list ready to send
URS IDRequirementSource sectionPageVendor 1 ▾Vendor 2
U3.8-05 v1.0
All rotating or otherwise moving parts should be correspondingly protected during operation against contact by hand - designed in accordance with EN ISO 13857.
3.8 Health, Safety and Environment16 Partial ⚠
"Transparent safety guard, complete machine protection made of aluminium profiles…"
8.0p.6
Partial ⚠
"The guarding is built up in aluminium profiles…"
7.1p.4
U3.8-17 v1.0
All equipment and installations must be designed in such a way that it is possible to use the LOTOTO (Lock-out / Tag-out / Try-out) system during maintenance.
3.8 Health, Safety and Environment18 Partial
"The system includes a 'lockable main switch'…"
8.4p.11
Not addressed
Not mentioned in the document.
U3.3-38 v1.0
Machine must be designed for manual feeding and removing of the trays.
3.3 General Technical8 Partial ⚠
"The products are placed crosswise by a…"
6.2p.9
Meets
"The machine is a stand-alone manually fed…"
9.5p.3
U3.10-22 v1.0
The system should automatically generate an audit trail for user actions that create or modify electronic records including electronic signatures.
3.10 ERES Requirements27 Partial
"The data to be stored are: machine…"
6.6p.19
Not addressed
"Software interface TBD"
Weighted by criticality, not by count
Supplier's own words
Vendor comparison - 247 requirements × every offer, with the quotation text and page behind each verdict.
Detail - Confidence

A confidence score you can interrogate, next to the page it came from

Confidence is not decoration. It reflects how directly the source text answers the requirement, whether the wording is verbatim or inferred, and whether other passages in the same document contradict it. Open the score and the platform highlights the passage in the supplier's own PDF.

Feature detail
U3.8-05 v1.0Vendor 1 - technical quotation✕
Partial▾
Transparent safety guard. Complete machine protection made of aluminium profiles … Transparent panes between the aluminium profiles on all sides and top.
8.0 / 10· page 6 · verbatim
Guarding is described and confirmed, but the offer does not reference EN ISO 13857 or state the safety distances the requirement calls for. Recommended action: raise as clarification CL-014.
Accept as partialChange statusAdd to clarifications
Vendor 1 - budget quotation 903421416 / 22-92%+
3.2.
Machine guard
3.2.1
Transparent safety guard
Complete machine protection made of aluminium profiles
All slots at open profiles closed with rails
Transparent panes between the aluminium profiles on all sides and top
2 hinged doors on the operator side
1 hinged door on the infeed of the machine
1 hinged door on the back of the machine
Flap that disengages at the transition from the conveyor belt infeed to the safety guard and triggers an emergency stop in the event of accidental engagement.
3.2.2
Electronic interlock switches
To prevent the machine from starting when the machine guard is open
3.2.3
Electromagnetic locking devices
The safety guard is electromagnetically locked when the machine is in automatic mode
3.3.
Applicator
Motorized unwinder · maximum label liner width 82 mm · maximum reel diameter 400 mm · core diameter 76 mm · connection CAN bus
Non-binding budget quotation · version 01Page 6 of 22
The score explains itself
Evidence detail - score, rationale, and the exact passage highlighted in the vendor's document.
Oversight

Coverage, confidence and open risk on one page - at any hour of the project

Validation status is normally a monthly slide built by hand. Here it is a live view: how much of the URS is evidenced, how much is tested, where confidence is thin, what is blocking, and who owns the next action.

Full screen
LYO4 - SKAN Isolator›Project status
Last run · 22 Jul, 09:14MB
URS coverage
94%
232 of 247 requirements evidenced
Mean confidence
8.6
91% above review threshold
Open gaps
15
4 critical · 11 major
Cycle time
2.1×
faster than the manual baseline
Coverage by qualification stage
Requirements (URS)247
Design Qualification94%
Installation (IQ)89%
Operational (OQ)70%
Performance (PQ)26%
FAT / SAT54%
Approved Drafted In review Blocked
Open items requiring a decision
U3.3-9No design evidence for glove integrity testingVendor question · open 6 d
U3.10-22Audit trail scope partial in both offersClarification CL-014
U3.3-3Transfer system match below threshold (6.4)Awaiting reviewer
U3.12-08Material certificate not in the document setDocument request
OQ-114Test step edited after approval - re-signature neededQA signature
FAT readiness: blocked by 4 critical items. All other prerequisites met.
Status is computed, not reported
Project status - coverage, confidence, and the specific decisions standing between the project and its next gate.
Stage 04 - Qualify

IQ, OQ and PQ protocols drafted from the matrix - not from a template

Every approved requirement produces test steps written against its own acceptance criteria, in your company's protocol format. Each step keeps the URS ID, the design evidence it was derived from, and the reason it exists. Steps with no requirement behind them cannot be created.

Full screen
LYO4 - SKAN Isolator›Qualification›OQ Protocol - draft v0.4
Version historyMB
Protocols
DQ - approved
IQ - approved
OQ - in review118
PQ - draft42
FAT / SAT
OQ sections
Operating modes14
Decontamination26
Alarms & interlocks31
ERES / Part 1119
Filters Draft protocol from matrix Send for approval Export to Word
Test IDTraces toTest stepAcceptance criteriaDerived fromStatus
OQ-041 U3.3-2 Select Production mode at the HMI. Record the mode indicator, differential pressure and air velocity after stabilisation. Mode indicator reads "Production". Δp ≥ 15 Pa. Air velocity 0.36–0.54 m/s. CO002 §7 Key features / legend · p.8
HDS001 §6 Control philosophy
In review
OQ-042 U3.3-2 Initiate VHP decontamination cycle. Record conditioning, decontamination and aeration phase transitions. All four phases execute in sequence. H₂O₂ residual < 0.5 ppm at cycle end. CO002 §15 · 704 Conditioning phase
CO002 §16 · 708 Aeration 1
In review
OQ-114 U3.10-22 Create an electronic record as User A. Modify one field. Open the audit trail. Entry shows user ID, UTC timestamp, previous value and new value. Record is not overwritten. Risk classification - Critical
21 CFR 11 §11.10(e)
Approved
OQ-115 U3.10-22 Attempt to delete an audit trail entry using an administrator account. Action is refused. Attempt is itself recorded in the audit trail. Negative test required by criticality rule Approved
OQ-088 U3.3-4 Verify all cable and fiber penetrations against the bulkhead schedule; perform a chamber leak test. Leak rate ≤ 5% of isolator volume at twice operating pressure. HDS001 §12 Penetrations & bulkheads
CO002 §11 Leak test options
Draft
Every step traces up and down
Sections mirror the URS structure
OQ protocol - test steps generated from approved requirements, each carrying the evidence it was derived from.
Stage 05 - Execute

FAT and SAT executed in the system, with deviations raised where they happen

Testers record the observed result against the acceptance criteria, attach photographs or instrument printouts, and sign. A failing step raises a deviation on the spot, links it to the requirement, and blocks the protocol from closing until it is resolved or justified.

Full screen
LYO4 - SKAN Isolator›FAT›Execution - Allschwil, 22 Jul 2026
In execution · day 2 of 3MB
Steps executed
96/142
68% complete
Passed
89
signed by 2 testers
Deviations open
5
2 critical · 3 minor
Punch list
11
issued to vendor daily
Test IDAcceptance criteriaObserved resultAttachmentsSignedOutcome
FAT-018Δp ≥ 15 Pa in production modeΔp = 52 Pa, stable over 30 minTrend export.pdfJ. Meier · 09:41
M. Baškovč · 09:44
Pass
FAT-019Air velocity 0.36–0.54 m/s at working height0.41 m/s across 9 measurement pointsGrid measurement.xlsx
2 photos
J. Meier · 10:12
M. Baškovč · 10:15
Pass
FAT-047H₂O₂ residual < 0.5 ppm at cycle end (drying phase excluded)0.8 ppm after 4 h aeration; cycle extended to 5 h 20 to reach 0.4 ppmSensor log.csv
Cycle report.pdf
J. Meier · 14:03Deviation DEV-004
FAT-051Glove leak test executable without breaking decontaminated stateNot executable - test port not fitted on gloveport 41 photoJ. Meier · 15:20Deviation DEV-005
FAT-052Alarm A-114 triggers at Δp < 10 Pa within 5 sAlarm raised at 3.2 s, logged and acknowledgedAlarm log.pdfJ. Meier · 15:48
M. Baškovč · 15:49
Pass
DEV-004
Aeration time exceeds URS limit. Linked to U3.3-2 and U3.3-3. Impact assessment required before SAT. Owner: SKAN process engineering. Due 29 Jul.
Open deviationAssess impact
Deviations counted, not buried
A failure links straight back to the requirement
FAT execution - results, signatures and deviations recorded against the acceptance criteria as the test runs.
Stage 06 - Control

Change one requirement and see everything it touches, before you commit

A revised URS clause, a design change, a new supplier revision - Qualitum runs the impact across the whole chain and lists the design evidence, test steps, executed results and signatures affected. Approve the change and the addendum protocol is drafted with only the delta re-tested.

Full screen
LYO4 - SKAN Isolator›Change control›CC-2026-018
Impact assessmentMB
The change
U3.3-2  Operating modes
The following operating modes must be foreseen: Production · VHP decontamination (aeration included) · Standby.
The following operating modes must be foreseen: Production · VHP decontamination (aeration included) · Standby · Cold production mode (2–8 °C shelf loading).
Process engineering · linked to DEV-004 · 22 Jul 2026
Impact scope: 3 documents · 9 test steps · 2 executed results · 1 signature invalidated.
What it affects
ArtefactItemRequired action
Design evidenceCO002 §7 Key features / legendRe-confirm
Design evidenceHDS001 §6 Control philosophyRe-confirm
Design evidenceFS001 §4 Mode sequencingVendor update required
OQOQ-041 · Production mode verificationAmend step
OQOQ-042 · VHP cycle phasesNo change
OQOQ-043…047 · new cold mode steps5 new steps drafted
FAT resultFAT-018 · executed 22 Jul, passedRe-execute
SignatureOQ protocol approval · QA, 04 JulInvalidated - re-sign
Draft addendum protocol Submit for QA approval Delta only - 138 unaffected steps retain their approval.
The blast radius, itemised
Change control - one requirement edit, the full downstream impact, and an addendum covering only the delta.
Detail - Compliance

Every action attributable, every signature meaningful

Qualitum records who did what, when, from where, and what the value was before and after - including every action taken by the AI engine, named as such. Signatures carry the signer's printed name, the meaning of the signature and the record it applies to, and cannot be transferred or reused.

Feature detail
Audit trail - record U3.3-2 Export for inspection
Timestamp (UTC)ActorActionDetail
22.07.2026 08:14:02Qualitum engine AIRequirement extractedFrom URS v2.1 §3.3.2 p.5 · confidence 9.1 · verbatim
22.07.2026 08:14:02Qualitum engine AICriticality proposedMajor · reasoning stored · model+prompt version recorded
22.07.2026 09:31:47M. Baškovč ReviewerCriticality overriddenMajor → Critical · rationale: "affects decontaminated state"
22.07.2026 09:32:10M. Baškovč ReviewerEvidence confirmedCO002 §7 selected from 4 candidates · 3 rejected
04.07.2026 11:02:55A. Kern QAProtocol approved · e-signatureMeaning: "Approved for execution" · OQ v0.3
22.07.2026 16:44:19SystemSignature invalidatedTriggered by CC-2026-018 · re-signature required
Entries cannot be edited or deleted by any role, including administrators. Retention follows the project record policy.
AI actions are logged like any user
Human override always beats the model
Audit trail - the AI engine, the reviewer and QA appear on the same record, with reasons attached.
Stage 06 - Report

The deliverables come out in your format, already reconciled

Requirement traceability matrix, DQ report, IQ/OQ/PQ protocols and summary reports, deviation log, vendor comparison and clarification list - generated from the live data in Word, Excel or PDF, in the customer's own templates, with citations preserved as footnotes.

Full screen
LYO4 - SKAN Isolator›Reports & export
MB
DeliverableFormatTemplateLast generatedState
Requirement Traceability Matrix
247 requirements · 18 documents
Excel · PDFNVS-QA-TM-0422 Jul · 09:16Current
Design Qualification Report
Includes candidate rationale appendix
Word · PDF/ANVS-QA-DQ-0218 Jul · 14:02Signed
OQ Protocol & Summary Report
142 steps · 5 deviations
WordNVS-QA-OQ-0722 Jul · 16:50Regenerate - CC-2026-018
Addendum Protocol - CC-2026-018
Delta only · 9 steps
WordNVS-QA-AD-01-Ready to draft
Vendor comparison & clarifications
2 offers · 31 clarifications
Excel · PDFInternal21 Jul · 11:30Current
Deviation log
5 open · 12 closed
ExcelNVS-QA-DL-0122 Jul · 17:02Current
Audit trail extract
Full project · 14 812 entries
PDF/A · CSV-On demandGenerate
Generate - Traceability Matrix
NVS-QA-TM-04 · Novartis QA matrix ▾
◼ Requirement text and ID ◼ Source section and page ◼ Design evidence with chapter reference ◼ Confidence score per match ◼ Test step coverage (IQ / OQ / PQ) ◻ Reviewer decision history
Footnote - document · chapter · page ▾
Excel (.xlsx) + signed PDF/A ▾
GeneratePreview
Generation is recorded in the audit trail with the exact data snapshot used.
Stale outputs flagged after a change
Reports and export - regulatory deliverables in the customer's own templates, generated from live, cited data.
01 / 14